Holder cleaning system.

Cleaning system for Holder
Cleaning system for Holder
Cleaning system for Holder

Final spurt in the assembly of large pre-treatment system

In the fall of 2017, DECKER recei­ved the order to manu­fac­tu­re a lar­ge pre-tre­at­ment sys­tem for Hol­der GmbH. As time is run­ning out befo­re the start of pro­duc­tion for the renow­ned sup­pli­er to the auto­mo­ti­ve indus­try, DECKER is alre­a­dy on the finis­hing line with the assem­bly and has once again mana­ged to com­ple­te a pro­ject of con­sidera­ble scope in a very short space of time. In this case: an ele­va­ted sys­tem, approx. 70 m long, 15 m wide and 12 m high with 25 sta­ti­ons, in which enti­re body side panels are clea­ned and pas­si­v­a­ted with acti­ve che­mi­cal liquid so that opti­mum adhe­si­on is achie­ved when the body is assem­bled.